Page 32 - Demo
P. 32
30REMC Ltd. rendered professional consultancy services in carrying out the feasibility studies for laying dedicated power transmission line for smooth transmission of power from various generators through Open Access for IR along the Golden Quadrilateral routes (i.e. Delhi-Mumbai, Delhi-Chennai, Mumbai-Howrah & Mumbai-Chennai). Feasibility studies were taken for assessing the viability of these projects. Initially, the survey of following 2 routes/section have been undertaken in the year 2017-18. Mugalsarai - Howrah route Mathura - Bharuch routeTransmission Line Planningand ManagementIR, being an energy intensive industry, is considering implementing energy-efficient measures in its infrastructure so that the need for increase in energy demand due to operational requirements can be optimised. Energy-efficiency is often viewed as a resource-based reduction in carbon emission. Besides economical and green power initiatives, the spectrum of REMC Ltd. services has been further extended to energy-efficiency projects.As collaborative effort, a MoU was signed between REMC Ltd. and EESL for venturing into Energy Efficiency Projects.A base line study/energy bench marking study has been undertaken by REMC Ltd. in association with KfW forproduction units of IR.Managing Energy-efficiency Projects